Global Oil Producer Leverages Real-World Models to Help Deploy Offshore Control System in Record Time
See how Genesis Consulting reduced “time to first oil” by two weeks, saving $3 million. This was accomplished through HYSYS and HYSYS dynamics models integrated with an FPSO's DCS control systems, for remote DCS testing and checkout.