Case Study

Nissan Chemical Develops Faster, More Accurate Steam Reformer Model Using Aspen Hybrid Models™

Nissan Chemical was looking to optimize its ammonia manufacturing process and reduce operating costs. To do so, they needed to find a model that would enable them to simulate the behavior of a real plant.

Case Study

MOL Group Drives Digitalization in Partnership with AspenTech

In this customer success story, learn how MOL recently added Aspen Mtell® software from the AspenONE® Asset Performance Management (APM) software suite to its portfolio of AspenTech solutions to drive efficiencies across plant operations and increase sustainability. This made a major contribution to operators in accelerating digitalization plans. Aspen Mtell has become an integral part of MOL’s strategic digitalization plan, which includes initiatives to extract increased value from its assets and increase overall plant availability to 96+ percent.

Case Study

Multivariate Statistical Analysis Finds the Bad Actors in Out-of-Spec Batches

Learn how a large producer of synthetic rubber used Aspen ProMV to identify the cause of ongoing quality issues with its batch products. Download the case study to read how Aspen ProMV uncovered the variables that correlated most with batch quality, resolving production problems faster to limit losses.

Case Study

Multivariate Statistical Analysis Finds Cause of Quench Oil High-Viscosity Issue

One of the world's largest chemical, plastic and refining companies used Aspen ProMV to understand and resolve production problems caused by an ongoing quench oil high-viscosity issue. In this case study, learn how Aspen ProMV enabled the company to highlight the top process variables highly correlated with viscosity issues, and quickly guided process engineers to the underlying issue to limit losses.

Case Study

Multivariate Statistical Analysis Finds the Bad Actors in Light Component Losses

This petrochemical company launched an Aspen ProMV™ pilot project to investigate light component losses that go to the bottom of a fractionation column and pressurize the downstream column. Using Aspen ProMV for continuous processes, a model was developed, and bad actors that are highly correlated to the light product loss were identified. Aspen ProMV’s optimization tool was also utilized to provide better operating conditions to reduce losses.

Case Study

LG Chem Significantly Increases Plant Capacity and Reduces Energy Usage

LG Chem increases capacity by 15% and saves energy through heat integration using Aspen Plus®, Aspen Energy Analyzer, and Aspen Exchanger Design and Rating

Case Study

Hitachi Zosen Case Study

ACM is extremely powerful in reducing engineering time by up to 30% for new and novel processes.

Case Study

Leading Refiner Reduces Planning Run Times from Hours to Minutes and Finds Profitable Solutions

Learn how this world leader in refining reduced planning runtime from 30 hours to 90 minutes, making the process 95% faster and allowing them to respond to market changes much faster.

Case Study

Reliance Industries Ltd Troubleshoots with Aspen Plus and Saves $2.4M USD per Year

Reliance, an Indian conglomerate, built an Aspen Plus model in-house for a distillation column revamp with Aspen Plus which resulted in increased production by $2.4M/year. Learn how they saved money by building the simulations themselves and coming up with a cost-effective solution.

Case Study

The Innovation Fast Track: Saving Time and Money in New Product Development

Learn how Qenos uses Aspen Plus® batch modeling to gain valuable insight into their processes, allowing them to respond to changing customer requirements with fewer plant trials and experiments.